Project: Logistic center project of Maoming

Project: Logistic center project ofMaoming

Overview: the project aims at building 16 warehouses with an area of 120,000
squaremetersandstockareaof 480,000squaremeters andwill beaddedwith110
transportationvehicles, 6shippingvesselsandabatchof newcomputers and networkfacilities. Theport ofMaomingis a Class 1national standardopenport tothe
worldwhichhas beenconstructedwith11container andproduct oil docks. It is 184
nauticalmiles away fromMacaoand202nautical miles away fromHong Kong and
isthenearly oceanchannel toWestGuangdong, theCentral Southand the South
West of China, HongKong, Macao, TaiwanandtheSoutheast Asia. Maoming
Petrochemical Corporation has the oil refinery capacity of 13.5 billion tons and the
capacityof producing1milliontons of ethyleneper year. Thefavorable conditions
have laid solid foundation for this company to develop the logistic and shipping
business in the future.

Mode of cooperation: joint ventureor cooperation

Period of cooperation: negotiable

Total investment: US$22million

Chinese side investment and composition: US$ 7.620,000, includingUS$ 1,
000,000 in capital and the others such as warehouses, storage tanks and transportationvehicles, etc. that arevaluedUS$6,260,000.

Foreign side investment and composition: contrition with capital or partial
capital investment and partial contribution with equipment and transportation vehicles.

Estimatedpaybackperiod:5years

Construction site:MaomingPort

Infrastructure available at the construction site: complete infrastructural facilities of supply of water, electricity, gas, roads andtelecommunication

Tuesday, August 25, 2009

Project : South China Highway Logistic Center merchant inviting project of Baoan, Shenzhen

Project : South China Highway Logistic Center merchant inviting project of Baoan, Shenzhen

Overview: SouthChinaHighway Logistic Center (hereinafter referredtoas "the
Highway Logistic Center") has been developed by Shenzhen Huatongyuan Logistics Co., Ltd.. It is located on the west side of Meiguan Expressway tollbooth
andonthe east ofMinzhi Highway, coveringa land area of approximately 120,000
square meters. The Highway Logistic Center has six (6) functions, to include special trade zone, cargo distribution center, CEPA electronic business zone, freetrade
and conventional zones, parking space and living and service zone. It is a
multifunctional digital logistic center that has integrated cargo shipping, warehousing, handling, packaging, logistic processing, cargodistribution, leasing, customs clearance, parking,maintenance, office, residence, restaurants, etc..

Mode of cooperation: leasing

Period of cooperation: 15years

Total investment: RMB260million

Estimatedpaybackperiod: 3-4years

Construction site: onthewest sideofMeiguan Expressway tollboothandon the
east ofMinzhi Highway

Materials of Project: omitted

Stateproject classification: encouraged

Saturday, August 22, 2009

Project: Coral reef natural preservationzonedevelopment project of Zhanjiang

Project: Coral reef natural preservationzonedevelopment project of Zhanjiang

Overview: the Dengloujiao provincial standard coral reef natural preservation
zone of Xuwen, Zhanjianghas passedthe assessment of specialists for becoming
anational standard natural preservation zone. It is located in Jiaowei Town in the
southernmost ofMainlandChinaand25kilometersfromthecounty. It isfamousfor
its well preservedcoral breedingareainthethecontinental shelf ocean. Thecoral
reef covers a land area of approximately 33 acres which is divided into two types
and49kinds. Thecoralshavehighvaluesof viewingand scientific research. The
development of thecoral reef has prospects of tourism and resort. Overseas merchants are welcometo invest in this area.

Mode of cooperation: joint venture, cooperationor solely ownedbusiness

Period of cooperation: 30years

Total investment: US$50million

Chinese side investment and composition: the Chinese party contributes
thelandas shares of investment

Foreign side investment and composition: investment withcapital

Estimatedpaybackperiod:5years

Construction site: Jiaowei Town, Xuwen

Infrastructure available at the construction site: complete infrastructural facilities of supply of water, electricity and telecommunication and provision of 3,000 acres of beachandlandfor building tourism facilities

Project: LingshanScenery siteproject of Guangzhou

Project: LingshanScenery siteproject of Guangzhou

Overview:developmentofLingshanscenerysitewhichcovers30,000acresofland

Modeof cooperation: solely ownedbusiness or cooperation

Periodof cooperation: 50years

Total investment: RMB500million

Chinese side investment and composition: land

Foreign side investment and composition: negotiable mainly invest with
capital andtechnologies

Estimatedpaybackperiod: 15years

Construction site: PaitanTown, Zengcheng

Infrastructureavailable at the construction site: 20,000 acres of forestry land
havebeenrented

Materials of Project: project profileavailable

Stateproject classification: allowed

Friday, August 21, 2009

Project: cooperative development project of Large Nanshan Mountain Eight-nation Tourism and Resort Jieyang

Project: cooperative development project of Large Nanshan Mountain Eight-nation Tourism and Resort Jieyang

Overview:It aims at building the eight -nation tourism and resort area in Large
Nanshan Mountain Overseas Chinese Area with the concept of Ecological Nanshanandcharacteristicsof theOverseasChineseAreabyutilizingthecharacteristicsof eight (8)SoutheastAsiannationsandtheuniquelocalecological advantages.

Modeof cooperation: Sino-foreigncooperation

Periodof cooperation: 30years

Total investment: US$10million

Chinese side investment and composition: invest with the existing infrastructural facilities, developed farmland and plantations which are valued US$ 2million
Foreign side investment andcomposition: investment of US$ 8million in the
tourism and sight-seeing facilities

Estimated payback period:6years

Construction site: Xiadi Mountain on the north of Sanqing Mountain, Large
Nanshan Overseas Chinese Administrative Zone, Jieyang (South China Ecological & Agricultural Cultural Technology Park)

Infrastructureavailableat theconstruction site: theproject has been partially
developed and it has complete infrastructural facilities. It has beautiful ecological
sceneries and is an ideal place for tourism, resort and summer holidays. The project has been selected by Guangdong province as a key project of poverty alleviationin2007.

Materials of Project: overall plan of Large Nanshan Mountain Eight -nation
TourismandResort Area, GuangdongprovincebyGuangdongTourismDevelopment ResearchCenter

Stateproject classification: allowed

Thursday, August 20, 2009

Project: Logistic center project of Lianping County Ecological Industrial Park, Heyuan

Project: Logistic center project of Lianping County Ecological Industrial Park,
Heyuan

Overview: the logistic center has a planned area of 100,000 square meters and
the total investment will be RMB 200,000,000. it aims at building a high-class
modern logistic center tha links the Pearl River Delta and the inland regions of
Chinaby dependingonLianpingCounty Ecological Industrial Park.

Mode of cooperation: joint ventureor solely ownedbusiness

Period of cooperation: 50years

Total investment: RMB200million

Chinese side investment and composition: investment withland

Foreign side investment and composition: investment in construction, jointventureoperation,
profit sharingandlandacquisition, investment inconstruction

Constructionsite: SanjiaoTown, LianpingCounty

Infrastructure available at the construction site: the land for the project has
beenacquiredwhichhas completeinfrastructural facilities of supply of water, electricity, roads andtelecommunication

Stateproject classification: encouraged

Project: Qiaoyuanfive-star hotel andtourismfacilities project of XiqiaoMountain, FOshan

Project: Qiaoyuanfive-star hotel andtourismfacilities project of XiqiaoMountain,
Foshan

Overview: it aims at building a five-star hotel in Jiaoyuan Scenery Site of Xiqiao
Mountain that integrates sight-seeing, resort, recreation and business in order to
createafive-star tourismservicearea.

Mode of cooperation: solely owned foreign business

Period of cooperation: 40years

Total investment: RMB600million

Foreign side investment and composition: negotiable

Estimated payback period:5years

Construction site: XiqiaoScenery Area, XiqiaoMountain

Infrastructure available at the construction site: the existing hotels, shop and
recreational facilities can be demolished, reconstructed or renovated according to
needs.

Materials of project: omitted

Stateproject classification: allowed

Wednesday, August 19, 2009

Project: Fashionindustry basepublic serviceplatformproject of Shenzhen

Project: Fashionindustry basepublic serviceplatformproject of Shenzhen

Overview: it consists of release center, information consulting center, digital design center, display center, HRdevelopment center, garmentmanufacture center,
R&D department and comprehensive office area. It is mainly used for research,
development, promotion, demonstration and professional training of new fashion
technologies. It isa public informationand technology platformandis used for promotingindustrial andtechnical standards.

Mode of cooperation: negotiable

Period of cooperation: negotiable

Total investment: US$26,720,000

Chinese side investment and composition: negotiable

Foreign side investment and composition: negotiable

Estimatedpaybackperiod: negotiable

Project: West River ecological and agricultural resort and tourismarea project of BanfuTown, Zhongshan

Project: West River ecological and agricultural resort and tourismarea project of
BanfuTown, Zhongshan

Overview: theWest River sideof BanfuTowcovers alandareaof 40squarekilometers, with approximately 40,000 acres of cultivated area, 21,000 acres of fish
ponds, over 10,000acresof ricefieldandover 10,000acres of landfor vegetables,
fruit andflowersandplants. Thisproject aimsat combiningtourismwiththemodern
leisure agricultural elements in order to promote the traditional agricultural education, extendthecountrysidecultureandcreatetherecreational activitiesbyutilizing
thelargetraditional water-front idyllic scenes. Thedevelopment includes a number of comprehensive tourism projects on the West River side based on agriculture, to include Guangfu Agricultural Demonstration Park, Zhongshun Dawei
Forestry Scenery, JinzhongMountainPark, FarmHouses, etc. whichcreateanew
ecological and agricultural leisure tourismarea that covers recreation, resort and
sight-seeing.

Mode of cooperation: solely ownedbusiness, joint ventureor cooperation

Periodof cooperation: 50years

Total investment: RMB96million

Chinese side investment andcomposition: land

Foreign side investment and composition: investment with capital, technologies andequipment
Estimatedpaybackperiod: 10years

Constructionsite: West River sidearea, BanfuTown, Zhongshan
Infrastructure available at the construction site: provision of land and complete infrastructural facilities of supply of water, electricity, roads and telecommunication

Materials of Project: project profileavailable

Stateproject classification: allowed

Project: Fashionindustry basepublic serviceplatformproject of Shenzhen


Project: Fashionindustry basepublic serviceplatformproject of Shenzhen

Overview: it consists of release center, information consulting center, digital design center, display center, HRdevelopment center, garmentmanufacture center, R&D department and comprehensive office area. It is mainly used for research, development, promotion, demonstration and professional training of new fashion
technologies. It isa public informationand technology platformandis used for promoting industrial andtechnical standards.

Mode of cooperation: negotiable


Period of cooperation: negotiable


Total investment: US$26,720,000

Chinese side investment and composition: negotiable


Foreign side investment and composition: negotiable


Estimatedpaybackperiod: negotiable

Construction site: the land of Shenzhen Fashion Industry Base for public service
andresearchanddevelopment

Materials of Project: investment invitationinprocess

Stateproject classification: allowed

Project: Shengang International Logistic Parkmerchant invitingproject of Shenzhen

Project: Shengang International Logistic Parkmerchant invitingproject of Shenzhen

Overview: ShenzhenWest Logistics Co., Ltd. is responsiblefor developinga land
area of 380,000 squaremeters and the Shengang International Logistic Park project has beenselectedasa key project of Shenzhen. It is primarily engaged in offering various moderncomprehensive logistic services to clients, to include export custodial warehouses, bonded warehouses, general warehouses, container storage, etc. inorder tocreateamodern comprehensive logistic park andbecome a high-end logistic supply chain provider. Currently the International Logistic Park endeavors to create the West Logistic Center in Shengang International Logistic Park which is a linkage logistic platformof export custodial warehouse and import bonded warehouse. The warehouse of Phase 1 has started operation which has a
constructionareaof 37,000squaremeters. The warehouse of Phase 2 has a construction area of 145,000 square meters which will start construction in July 2009
and is planned tostart official operationin2010. It will becomea high quality single
warehouse with best service in Shenzhen and the satellite cities. By the time the
construction has been completed, a number of logistic plans can be designed depending on its large dual warehouse business function in order to satisfy the demands of various clients. It wishes to invite trade logistic projects and industrial companies fromabroad.

Mode of cooperation: solely ownedbusiness

Period of cooperation: tobedecided

Total investment: RMB350million

Chinese side investment and composition: ShenzhenWest Logistics will invest 100%

Foreign side investment andcomposition: tobedecided

Estimatedpaybackperiod: 12years

Constructionsite: Block 1 land, ShengangInternational Logistics Park

Infrastructureavailableat theconstructionsite:
The total investment inWarehouseAproject is RMB126 million. The construction
has been completed and it has started operation. The warehouse has two floors
with a warehousing area of 37,000 square meters and an office area of 5500
square meters. Themajor business includes custodial warehouse, bonded warehouse and general warehouse.

It is estimatedthat theinvestment inWarehouseB, Phase1will be RMB224million. Theconstructions will start inJuly 2009andwill becompletedinAugust 2010.
It is estimated that thenewwarehouse will start operationin October 2010. WarehouseB, Phase1will bea3-floor warehouse of concretestructurewhichcovers a
landareaof 62,000squaremeters andhas the construction areaof 73,000 square
meters.

Materials of Project: project profileandrelevant advisingmaterials available

State project classification: this is a state encouragement project which has
been awarded thetitles of Shenzhen Key Construction Project and Shenzhen Key
Logistic Project andit has a number of preferential policies fromthegovernment.

Project: Chenghai Toys andCrafts LogisticMarket project of Shantou

Project: Chenghai Toys andCrafts LogisticMarket project of Shantou

Overview: the project aims at combining the original Chenghai Plastics Arcade,
Chenghai Exhibition Center, GDCargo Shipping Center, Chenghai. Chenghai
FruitMarket andthe Flower & PlantMarket to build the largest logistic center, the
information center and the technology development center in the east of Guangdong province which exhibit the characteristics of plastic toys, technologies and wool garmentsofChenghai. Theproject islocatedat theintersectionbetweenNo. 324 Highway and Zhongshan Road North in Chenghai and it is near the Lotus ShoppingMallwiththeconstructionareaof over 20,000squaremeterswhich is the busiest business quarter inChenghai. Chenghai Plastics Arcade covers 35 acres of landandhastheconstructionareaof 27,500squaremeters. Chenghai ExhibitionCenter covers 24acres of landandhas theconstructionareaof 15,000square
meters whichis amodernexhibitioncenter that has integratedsales andexhibition
andhasheldthe10thChinaToys Fair. GDCargoShippingCenter covers 44acres
of landandhastheconstructionareaof 6000squaremeters whichis the large cargo shipping center in Chenghai. Chenghai Fruit Market and the Flower & Plant Market cover 14acresof landand17acresof landrespectivelyandthey have complete infrastructural facilities.

Mode of cooperation: joint ventureor cooperation

Periodof cooperation: negotiable

Total investment: RMB80million

Chinese side investment and composition: negotiable

Foreign side investment and composition: negotiable

Estimatedpaybackperiod: negotiable

Infrastructureavailableat theconstruction site: negotiable

Stateproject classification: allowed

Project: Ecological tourismand resort comprehensive development project of Qiao Island, Zhuhai

Project: Ecological tourismand resort comprehensive development project of Qiao Island, Zhuhai

Overview: it aims at developing a comprehensive tourismarea by utilizing the ecological resources of Qiao Islandthat integrates ecological tourismandresort.

Mode of cooperation: to be decided

Period of cooperation: to be decided

Total investment: to be decided

Chinese side investment and composition: to be decided

Foreign side investment and composition: to be decided

Estimated payback period: 10-20years

Construction site: QiaoIsland, Zhuhai Hi-techz zone

Infrastructure available at the construction site: complete infrastructural facilities of six supplies and one leveling, to include supply of water, electricity, roads,
telecommunication, wastewater release, water releaseandleveledground.


Attachment: Background of theChineseside:

Zhuhai Hi-tech zone is located in the north of Zhuhai which is near the city proper
of Zhuhai. It is locatedat the foot of Phoenix Mountain andfaces SouthChina Sea,
withacoastal lineof over 10kilometers. The scenery of this area is attractivehas it
has open sea, islands, golf course, international car racing site, large villa zone
and fishing villages nearby. It is anarea in Zhuhai for developing technologies and
for exhibition as it strong HR resources of technical force and teaching force and
historical and cultural treasures. Its hi-tech industries such as software industry
andICindustry have gained rapid growth.

Tuesday, August 18, 2009

Project: Automobileandautopartmanufacturingproject of Jiangmen

Project: Automobileandautopartmanufacturingproject of Jiangmen

Overview: theproject siteislocatedinXinningPrivateTechnologyParkof Taishan
whichhasbeenapprovedbytheprovincial government andit isnear thecityproper
of Taishan. Theplannedlandhascompleteinfrastructural facilitiesandanumber of
auto part and metal part manufacturing companies have started operation or are
under construction.

Modeof cooperation: solely ownedbusiness

Periodof cooperation: unlimited

Total investment: negotiable

Foreign side investment and composition: negotiable

Estimatedpaybackperiod:3years

Construction site: XinningPrivateTechnology Park, Taishan

Infrastructure available at the construction site: the local government provides land for industrial uses at the best prices which has five supplies and one
levelingas well as thenecessary infrastructural facilities.

Stateproject classification: encouraged

Project: Precision bearing and various principal machine special bearing manufacturing project of Zhongshan

Project: Precision bearing and various principal machine special bearing manufacturing project of Zhongshan

Overview: the project aims at producing precision bearings and various special
bearings used for principal machines which can be used for automobiles, motorcycles, sewingmachines, and power tools. Thetechnical requirements will beprecision powder metallurgy.

Modeof cooperation: solely ownedbusiness

Periodof cooperation: 20years

Total investment: US$11million

Sunday, August 16, 2009

Project: GaomingDemonstrationPark project of FoshanCeramic Industrial Base

Project: GaomingDemonstrationPark project of FoshanCeramic Industrial Base

Overview: the park covers a land area of approximately 3766 acres and it aims at
building a fine ceramics production base for manufacturing fine ceramic products
of high quality and high added values, to include special ceramic products, industrial ceramic products, electric ceramic products, etc.. Inaddition, it will alsobuilda
clean, environmental and highly effective ceramic powder and standard rawmaterial production base. The projects that chose to settledown inthis parkmust satisfy the requirements of clean production, clean transportation, clean energy and clean storage. The entry into the park must meet the seven (7) following requirements: (1) the industrial companies entering the park must satisfy the assessment standard of Foshan Cemramic Industrial Structure Adjustment Assessment Guidelines; (2) the industrial companies entering the park must use clean energy,
such as natural gas; (3)the industrial companies entering the park must have
achieved the total tax payment of RMB30 million or above in the last three years;
(4) the productsmanufactured by the industrial companies entering the park must
be fine ceramic products; (5) the industrial companies entering the park must be committed to achieve the following targets within the specified time: pass
ISO9001 quality certification;
pass ISO14000 environmental management certification;
meet the clean productionstandard of the district; (6) the buildings
in thepark shouldmeet the national green standard and exhibit the characteristics
of ecological industrial park; (7) companies of famous brands will havethepriority.

Mode of contractedservices: production, researchanddevelopment center

Mode of investment: joint venture, cooperationor solely ownedbusiness

Total investment: RMB1.5billion

Chinese side investment and composition: provision of land and constructionof infrastructural facilities

Foreign side investment and composition: investment with capital, machinery, technologies andfactory buildings

Estimated payback period:6years

Construction site: XiaodongIndustrial Development Zone, GengheTown

Project: Hydraulic cylinder productionexpansionproject of Zhaoqing

Project: Hydraulic cylinder productionexpansionproject of Zhaoqing

Overview: theproduction volume of this company has not been able tomeet the
demand of themarket due to the limit of the productionmachinery and equipment.
Based on the surveys and negotiations, this company has decided to import the
dedicatedproductionlinesfromSouthKorea.Theimportedproductionlineisof high
professionalism, lessseveremachiningoperations, highefficiencyandhighquality
reliability. It canincreasetheproductionvolumefor20timesafter it hasstarted production.

Modeof cooperation: negotiable

Periodof cooperation: negotiable

Total investment: RMB30,000,000

Chinese side investment and composition: existing production machinery
andfactory buildings

Foreign side investment andcomposition: negotiable

Estimatedpaybackperiod: tobeevaluatedby both parties

Construction site: Zone 125, North of Guojing Highway, Dachong, Huanggang
Town

Saturday, August 15, 2009

Project: Horizontal dualwater coolingengineproject of Jiangmen

Project: Horizontal dualwater coolingengineproject of Jiangmen

Overview: it develops, produces and sells various styles of vertical water cooling
engines, vertical air coolingengines andhorizontal air coolingengines with the annual productionvolumebeing1,200,000unitsof horizontalwater coolingengines.

Modeof cooperation: joint venture, cooperationor solely ownedbusiness

Periodof cooperation: 10years

Total investment: US$20,000,000

Foreign side investment andcomposition: negotiable

Estimatedpaybackperiod: 5years

Constructionsite: ChenshanIndustrial Zone, Yayao, Heshan

Infrastructureavailableat theconstructionsite: complete infrastructural facilities


Stateproject classification: encouraged

Project: LongzhuHot Springdevelopment project of Dianbai,Maoming

Project: LongzhuHot Springdevelopment project of Dianbai,Maoming

Overview: Dianbai Longzhu Hot Spring is located at the foot of Pankeng Mountain where the scenery is beautiful and the climate is mild and the original vegetation has beenwell preserved. It is near Pankeng Reservoir and Pankeng Temple.

Hot spring of 70flows out fromthespringmouthall year roundwithout changeof
temperature. It is anideal tourismandresort site.
Modeof cooperation: joint ventureor cooperation

Periodof cooperation: 10years

Total investment: US$5million

Chinese side investment and composition: provision of necessary resources andpartial infrastructural resources for constructingtheproject.

Foreign side investment andcomposition: US$4million

Estimatedpaybackperiod: 10years

Constructionsite: Wuyi VillageCommittee, GuanzhuTown, Dianbai

Infrastructure available at the construction site: it has convenient transporta
tionasit isonly6kilometersfromGuanzhuTown. It hascompleteinfrastructural facilities of supply of water, electricity andtelecommunication

Stateproject classification: encouraged

Project: Windpower equipment manufacturing base project of Zhanjiang

Project: Windpower equipment manufacturing base project of Zhanjiang

Overview: the city has been actively developing the downstreamsupporting industries relatedwithsteel by depending on the local deep-water port and the steel plant investment of Shanghai Baosteel Group Corporation in Zhanjiang with the productioncapacityof over tenmilliontonsof steel per year. Zhanjianghase stablished the wind power equipment manufacturing base in the new area of Donghai Island, Zhanjiang Economic and Technology Development Zone in order to seek opportunities for further development. Currently 500 acres of land have been plannedfor theproject.

Modeof cooperation: solely ownedbusiness, joint ventureor cooperation

Periodof cooperation: 50years

Total investment: RMB100million

Project requirements: the force of investment will be No less than RMB 1,500,
000per acre, theforceof output will beNoless than RMB3,500,000 per acre and
theforceof taxationwill beNoless thanRMB160,000per acre

Construction site: the new area of Donghai Island, Zhanjiang Economic and Technology Development Zone

Project entity: Technology and Investment Invitation Bureau of Zhanjiang Economic andTechnology Development Zone

Thursday, August 13, 2009

Project: Processingandmanufacturingproject of Heyuan

Project: Processingandmanufacturingproject of Heyuan

Overview: the project aims at building a refractory material factory. The place of
the project is rich refractory stone materials which are mainly used for manufacturing high aluminumrefractory bricks for industrial furnaces. The products have
stable performance, broad uses and prospective market.

Model of cooperation: joint venture, cooperationor solely ownedbusiness

Periodof cooperation: tobedecided

Total investment: tobedecided

Chinese side investment and composition: tobedecided

Foreign side investment and composition: tobedecided

Estimatedpaybackperiod: tobedecided

Construction site: ZijinCounty

Stateproject classification: encouraged

Wednesday, August 12, 2009

Project: Logistic center project of Lianping County Ecological Industrial Park, Heyuan

Project: Logistic center project of Lianping County Ecological Industrial Park,
Heyuan

Overview: the logistic center has a planned area of 100,000 square meters and
the total investment will be RMB 200,000,000. it aims at building a high-class
modern logistic center tha links the Pearl River Delta and the inland regions of
Chinaby dependingonLianpingCounty Ecological Industrial Park.

Mode of cooperation: joint ventureor solely ownedbusiness

Period of cooperation: 50years

Total investment: RMB200million

Chinese side investment and composition: investment withland

Foreign side investment and composition: investment in construction, jointventureoperation,
profit sharingandlandacquisition, investment inconstruction

Constructionsite: SanjiaoTown, LianpingCounty

Infrastructure available at the construction site: the land for the project has
beenacquiredwhichhas completeinfrastructural facilities of supply of water, electricity, roads andtelecommunication

Stateproject classification: encouraged

Project: Cruiseshipandfishingboat repair andbuildingproject of Shantou


Project: Cruiseshipandfishingboat repair andbuildingproject of Shantou

Overview: the total investment of the project will depend on the requirements of
client regardingthe types, ratingstandards and annual production volume of ships
and boats for repair and building. It is estimated that the registered capital will be
No less than RMB10,000,000. It will have the capacity of building nearly ten (10)
ships with the tonnage below800 tons and repairing approximately forty (40) in land river transport ships and fishing boats per year. It is required that the investor is knowledgeable with the repair and building of ships and boats and has stable production orders and clients. All interested parties are welcome to meet with us
for discussion. Our company is asmall professional business established in 1956
and it is primarily engaged in repairing and building small ships and boats. It has
strong technical force and rich production experience in this industry and has received Production and Technology Permit issued by Guangdong Provincial Register of Shipping. It is amember of ShantouNaval Architects Society.

Total investment: the amount of investment will be decided depending on the investment scaleandthetypes of ships andboats for repair andbuilding.


Modeof business: cooperation, leasingor others negotiablebetweentheparties

Rate of investment: the amount of capital contribution is negotiable depending
onthemodeof cooperation

Estimated payback period: to be decided by the investment scale by the
vestor, theorder volumeandtypes of ships andboats

Construction site: Xiawei Area, HaojiangDistrict, Shantou, Guangdong province
Infrastructureavailableat theconstructionsite: this factory currently has invested
over RMB 5,000,000 in building the factory site, with a factory area of approxi
mately 20 acres (13,000). The load bearing tonnages include an electric railway
drydock of 300 tons, an electric railway drydock of 150 tons and a set of 160KAV
power supply system.
The accessories include lathe and bench workmoulds.

Tuesday, August 11, 2009

Project: NanshanShipBuildingBaseproject of Guangzhou


Project: NanshanShipBuildingBaseproject of Guangzhou

Overview: it aims at constructing a large ship yard for building and repairing ships
by depending on the rich inland river bank resources and the leading position of
China State Shipbuilding Corporation (CSSC) so as to satisfy the needs of build原
ing super -tonnage oil tanks of 300,000 tons and of repairing and refurbishing
large ships. It is the third largestmodern ship building base in China. Currently the
ship building and ship repair project has started production and it is estimated that
the first super-tonnage oil tank of 300,000 tons will be launched to water by the
second half of 2009. It ismainly focused on inviting projects related with large ship
building, ocean work craft building, container manufacturing, large steel structure
products and ship repair and refurbishing services in order to develop industrial
companies and products related with the ship building industry and actively develop the oceanographic engineering industry.


Model of cooperation: Sino-foreign joint venture, cooperation or foreign solely
owned business

Periodof cooperation: 30years

Total investment: depending on the scale of the companies

Chinese side investment and composition: to be decided by depending on
themodeof cooperation


Foreign side investment and composition: to be decided by depending on
themodeof cooperation


Estimated payback period: to be decided by depending on the mode of cooperation


Infrastructureavailableat theconstructionsite: complete

Materials of Project: complete

Stateproject classification: allowed

Sunday, August 09, 2009

Project: Theconstructionandoperationproject of docks inYangjiang

Project: Theconstructionandoperationproject of docks inYangjiang

Overview: the project includes the construction of two (2) docks with the handling
capacity of 5,000tons, two (2) docks with the handling capacity of 30,000tons,
one (1) dock the handling capacity of 100,000 tons and one (1) dock with the handling capacity of 300,000tons.

Model of cooperation: joint ventureor cooperation

Period of cooperation: 50years

Total investment: US$300million

Chinese side investment and composition: landinvestment

Foreign side investment and composition: capital andequipment

Estimatedpaybackperiod: 12years

Construction site: FengtouPort, Yangxi County

Infrastructure available at the construction site: Lingang NewDistrict is located at the outlet of Fengtou River to the sea and the main water channel after the
renovation has the depth of 20meters and the level of ebb tide for the port basin is
14meters.

Stateproject classification: encouraged

Chemical town project of Dacheng Bay Heavy Chemical Area, Chaozhou Port

Project: Chemical town project of Dacheng Bay Heavy Chemical Area, Chaozhou
Port

Overview: Dacheng Bay Heavy Chemical Area covers a land area of 30,000
square meters and it plans to invest in the construction of four (4) industrial projects, to include petroleum product - aromatic hydrocarbon, ethylene - base chemical materials - synthetic materials, base chemical materials - base organic chemical products andrubber processing -tires andprecisionrubber products.

Model of cooperation: joint ventureor solely ownedbusiness

Period of cooperation: 50years

Total investment: US$1.2billion

Chinese side investment and composition: landprovision

Foreign side investment and composition: capital andtechnologies

Estimatedpaybackperiod: 10-15years

Constructionsite: onthepremises of DachengBay

Infrastructure available at the construction supply, electric power supply androads has

Materials of the project: refer to the 11th five-year plan of Chaozhou

State Project classification: encouraged

Saturday, August 08, 2009

The B-zone project of Nansha International Automobile Industrial Park, Guangzhou

Project: The B-zone project of Nansha International Automobile Industrial Park,
Guangzhou

Overview: since the Toyota engine project and complete Toyota car project of
Guangzhou Automobile Group Co., Ltd. (hereinafter referred to as "GAC") settled
down in the A-zone of Nansha International Automobile Industrial Park, over 20
manufacturers have started operation, which are primarily engaged in manufacturing parts for Toyota cars. A large number of service companies have also entered the Nansha which are mainly engaged in providing services to the automobile industry of Nansha, to include training, marketing, maintenance and repair, logistics, etc.. The effect of industrial concentration is significant. The second production line will start production in May this year which will have the capacity of producing200,000Toyotacars in2009andthetotal production capacity of Toyota
cars byGACwill reach400,000units by then. TheB-zoneof Nansha International
Automobile Industrial Park is located at the central area of Nansha Development
Zoneand is 18kilometers away fromthe Toyotaproduction base. It is 15 kilometers away fromtheNanshaPort of GuangzhouHarbor andis close to the express way of Nansha Port. It is 30-minute drive fromthe city proper of Guangzhou. The B-zone is an internationalized industrial park built with high standard and it is designed to attract the Class 2 and Class 3 auto parts manufacturers and machinery manufacturing companies to settle down on its premises. The industrial companies that have invested in the B-zone will be provided with complete infrastructural facilities and will receive the human-based services of employee dormitory,
canteens and security guards. In addition, they will be able to share some of the
suppliers with the Japanese cars which will increase their localized procurement
rateof parts inorder toreducetheproductioncost.

Modeof cooperation: SiNo-foreignjoint venture, cooperation or solely owned
foreign business

Periodof cooperation: 30years

Total investment: depending on the scale of each company

Chinese sides investment andcomposition: to bedecidedby themodeof cooperation

Foreign side investment and composition: to be decided by themode of cooperation
Estimatedpaybackperiod: tobedecidedby themodeof cooperation

Construction site: NanshaDevelopment Zone,Guangzhou

Infrastructureavailableat theconstruction site: complete

Materials of theproject: complete

Stateproject classification: encouraged

Friday, August 07, 2009

Xiangshi Technology Industrial Park project of Dongguan

Project: Xiangshi Technology Industrial Park project of Dongguan

Overview: theproject aims at buildinganurbanecological technology park that integrates technology researchanddevelopment, production and product exhibition which is namedDongguanXiangshi Technology Industrial Park

Mode of cooperation: development of land for industrial use and land for commercial use, investment invitationonbehalf of theindustrial park andcontrol of investment invitation

Periodof cooperation: 50years

Total investment: RMB2billion

Chinese side investment andcomposition: RMB1billion

Construction site: at the intersection angle between Songshanhu Road and
ShidaRoad, LiaobuTown, near SongshanhuTechnology Industrial Park
Infrastructure available at the construction site: threesupplies and one leveling, to include supply of water and electricity, telecommunication service, license of landfor industrial useandlicenseof landfor commercial use.

Materials of the project: the industrial park covers over 2,000 acres of land and
is mainly planned for developing hi -tech photoelectric and digital industries,
strengthening the connection with the industries of Songshanhu Technology Industrial Park, attracting research and development entities, upgrading the technical platform, improving the abilities of independent creativity and promoting restructure and upgrading of all industrial companies in the county. The industrial park has beenplanned with high start-point, high quality and high standard on the basis of studies and introduction of the construction experiencefromabroad and it is designed to establish an ecological and leisure-type technology industrial park with the harmonious environment between man and nature, landscape and industry with reasonable distribution of functions. The park will have beautiful natural environment and the overall the afforesting rate reaching 40%. The construction of the ecological environment has achieved great success which includes the
landscape passage along the river, the ecological park, the central park with trees
andflowers onthebanks of theriver.

Stateproject classification: encouraged

Thursday, August 06, 2009

Dock constructionproject of ShaoguanPort in Shaoguan

Project: Dock constructionproject of ShaoguanPort inShaoguan

Overview: this project aims at expanding the port of Shaoguan into a comprehensive foreign trade port with the designed handling capacity of one million tons per year. The major constructionstructures includea container berth (with the water front of 60 meters), three (3) berths for general merchandise (with the water front of 146meters) and three (3) berths for bulk goods (with the water front of 141 meters). Thetotal lengthof the dock will be 347meters and the structure is designed in compliance with the Class II construction standard. The civil construction area will be1800squaremeters intotal.

Total investment: RMB150,000,000

Construction site: Dakengkou,Wushi Town, QujiangCounty

Infrastructure available at the construction site: the existing dock has excellent basic conditions with the best water depth in the city. The water front line is long and straight and the water level of the dock basin and flow rate are of stable changes the year round. The water channel is of high quality and high class with excellent water transportationconditions.

Stateproject classification: allowed

Wednesday, August 05, 2009

Technical innovation project of centralized gas supply in the industrial

Project: Technical innovation project of centralized gas supply in the industrial
areaof DachongTown, Zhongshan

Overview: theproject aims at findingapartner tocooperateinthetechnical
innovationof centralized steam supply to the industrial area which can reducethe
rate of boiler building by the industrial companies, improvework efficiency and
protect the environment in order to save energy and reduce waste release.

Model of cooperation: joint ventureor cooperation

Period of cooperation: negotiable

Total investment: RMB250million

Chinese side investment and composition: it uses 50acres of landas an
investment of RMB30millionandinvests RMB20millionincashwhichwill cover
20%of theshares

Foreign side investment and composition: investment of RMB200millionin
cash

Estimated payback period:5years

Construction site: LantianCommunity, DachongTown, Zhongshan(the
previous address of ShunlianBick Factory)

Infrastructure available at the construction site: 50acres of land and facilities
of water supply, power supply and telecommunication

Materials of project: the planning is in process

Stateproject classification: allowed

Monday, August 03, 2009

Waste water treatment factory project of Huliao Town, Dapu County

Project:Waste water treatment factory project of Huliao Town, Dapu County,
Meizhou witht daily capacity of 20,000tons

Overview: it aims at introducing advanced living waste water treatment technology and equipment toset upa plant withthedaily capacity of treating 20,000tons of
livingwastewater

Model of cooperation: BOTcooperation

Period of cooperation: 50years

Total investment: RMB25million

Chinese side investment andcomposition: thecounty government will bere
sponsible for the construction of waste water collection pipelines for the waste water treatment plant

Foreign side investment and composition: investment in the construction of
thewastewater treatment plant andoperationandmanagement of theplant

Estimated payback period: 20years

Construction site: Kengkou, Huangtian, DapuCounty

Infrastructure available at the construction site: the planned land for construction is located by the side of Tianjiabing Stadium and the county has a complete
network of wastewater collectionpipelines.

Materials of project: project profileavailableandfeasibility study report

Sunday, August 02, 2009

Gigante Guangdong

A partir de hoje irei postar algumas (mais de 200 projetos) que estou recebendo via contatos empresariais da região de Guangdong na China.

Para quem não sabe, Guangdong é a província mais rica a poderosa da China. Ela sozinha representa 1/8 de todo PIB da China. Sim, 1/8!!
A China possui mais de 35 unidades administrativas. A China hoje é dona do terceiro maior PIB mundial, é só fazer as contas do quanto Guangdong representa.

Quem estiver interessado em mais detalhes ou contato, escreva um e-mail.