Technical innovation project of centralized gas supply in the industrial
Project: Technical innovation project of centralized gas supply in the industrial
areaof DachongTown, Zhongshan
Overview: theproject aims at findingapartner tocooperateinthetechnical
innovationof centralized steam supply to the industrial area which can reducethe
rate of boiler building by the industrial companies, improvework efficiency and
protect the environment in order to save energy and reduce waste release.
Model of cooperation: joint ventureor cooperation
Period of cooperation: negotiable
Total investment: RMB250million
Chinese side investment and composition: it uses 50acres of landas an
investment of RMB30millionandinvests RMB20millionincashwhichwill cover
20%of theshares
Foreign side investment and composition: investment of RMB200millionin
cash
Estimated payback period:5years
Construction site: LantianCommunity, DachongTown, Zhongshan(the
previous address of ShunlianBick Factory)
Infrastructure available at the construction site: 50acres of land and facilities
of water supply, power supply and telecommunication
Materials of project: the planning is in process
Stateproject classification: allowed

0 Comments:
Post a Comment
<< Home