Waste water treatment factory project of Huliao Town, Dapu County
Project:Waste water treatment factory project of Huliao Town, Dapu County,
Meizhou witht daily capacity of 20,000tons
Overview: it aims at introducing advanced living waste water treatment technology and equipment toset upa plant withthedaily capacity of treating 20,000tons of
livingwastewater
Model of cooperation: BOTcooperation
Period of cooperation: 50years
Total investment: RMB25million
Chinese side investment andcomposition: thecounty government will bere
sponsible for the construction of waste water collection pipelines for the waste water treatment plant
Foreign side investment and composition: investment in the construction of
thewastewater treatment plant andoperationandmanagement of theplant
Estimated payback period: 20years
Construction site: Kengkou, Huangtian, DapuCounty
Infrastructure available at the construction site: the planned land for construction is located by the side of Tianjiabing Stadium and the county has a complete
network of wastewater collectionpipelines.
Materials of project: project profileavailableandfeasibility study report

0 Comments:
Post a Comment
<< Home